|
Bridge
Maintenance- The
report referred to 182 LIRR bridges that are “not in a
state of good repair though still functional and safe.”
It called for the hiring of 30 additional workers to
upgrade and maintain the bridges.
Any changes to LIRR bridges in Garden City will
result in enormous traffic effects both on Nassau Blvd as
well as any streets throughout the village that tie into
Nassau Blvd. The
historic roadway “cut-through” at Tanner’s Pond Road
and Main Ave will also be affected by the addition of the
Third Track.
|